Healthcare and CCRC Lehigh Valley Hospital - Regional Heart Center
Construction consisted of three phases over a period of 18 months in the middle of the hospital (on the 3rd floor and throughout 4 wings). The renovation is for new PCU, ACU, and 7 Cath./E.P. Labs. The existing areas were temporarily relocated during construction. The addition is on top of a 2nd floor roof. The work required in the 2nd floor ceilings was in the Burn Unit, Radiology, PACU, Emergency Department, Pediatrics, and three Operating Rooms. |