Healthcare and CCRC
Geisinger Health System CMC C&E Wing Expansion - Scranton

The Geisinger Community Medical Center Campus Expansion project involves 4-stories of new and renovated construction entailing approximately 191,000 square foot in and around the existing hospital in Scranton, Pennsylvania. Part of the new construction is a three-story overbuild over the existing emergency room while the rest is built in a treed lot in front of the main entrance.

Renovations to four floors of the existing building includes:

  • GI Suites
  • Electrophysiology Lab (EP)
  • Post-Anesthesia Care Unit (PACU)
  • Pre-Op Suite
  • OR Support Space; lockers, lounge and offices

New construction included:

  • Central Sterilization Reprocessing (CSR) – Basement Level
  • New main lobby – 1st Level
  • Clinic - 1st Level
  • Emergency room entrance - 1st Level
  • 14 - OR suites - 2nd Level
  • 18 – Intensive Care Units (ICU) - 3rd Level
  • Pedestrian Bridge

Construction phasing is crucial to this project to ensure the hospital remains operational throughout construction. The project was completed in five phases with new construction and existing building renovations occurring simultaneously.

Phase I – Relocate main entrance and create temporary ED entrance
Phase II – New Construction
Phase III – Pre and Post OP and OR support
Phase IV – PACU Area
Phase V – GI Suites Area